Week 22 - More finishes

Week 22 - Feb 11-15

We are getting near the end, which means a series of mini-crises almost daily.

2 weeks ago:
Tuesday - the cabinets for the basement bathroom are too big. Why, might you ask? Well, the bathroom was 2" narrower than designed, because a wall had to be furred out for electrical. This means that the cheapest things to do is to swap out the 27" sink base with a 24" sink base. I got a discount on the new piece, but it's still another extra - anyone looking for a 27" white shaker vanity sink base? ha!
Wednesday - the toilet is on backorder and we won't get it for at least 3 weeks. This one isn't so bad because it's our second bathroom and I don't have time to pick a different toilet, so I'm going to just leave this one alone.

Saturday of President's Day weekend
Tile in the entrance foyer

And into the closet

Looking toward the kitchen from the front door.

Our bench is blue! It wasn't suppose to be blue, it was suppose to be white, but after a few days of looking at it, we decided that we actually liked it. Contractor added a coating of polyurethane to protect it from scratches since the darker color will show more scratches than it would have if it was white.

Looking from the dining room through the kitchen to the living room,

The doors, still blue. They will be white again soon.

Laundry room. The tile floor is finished under that paper

Laundry nook

Shower tile under way


Walk-in closet

Our sump pit

They put this weird trim at the stairs. It's fixed now.


The kitchen.





The west side of the kitchen

New trim in the living room

Monday - President's Day

Back door, installed

Better view of the banquette.

And the weird stair trim is fixed!



Looking up the stairs 




Trim at the stairs at the basement

Laundry nook with the cabinet installed.

Bathroom casework partially installed. The missing piece is the one that ended up having to be replaced because it was too big. This was because the west wall had to be furred out, which reduced the width of the room by 3".

Tall cabinet in the bathroom


My new cooktop!

New microwave, cooktop, and wall oven


New washer and dryer! The delivery guys wanted a lot extra to put them downstairs, so they ended up in the kitchen.

Comments

Popular posts from this blog

Week 10 - More Masonry and Framing

End of Week 1

Punchlist Day 1 - First Floor is almost done!