End of Week 2 - Demo mostly done
The rest of the kitchen was demolished yesterday (Friday) and we can now really see into the bones of the wall to see where things might have to be re-routed and to really understand the pipe and duct paths. What I thought was a brick bump out next to the door was just a plaster one to conceal the waste pipe for the sink and what I think is the plumbing vent to the roof. I'm hoping we can find a way to re-route these so that we don't have that weird bump-out and maybe we can gain that 4 inches in the kitchen. The plaster is also all gone and will be replaced with a drywall furring wall. The pipe on the left connected to the kitchen drain. From what I can tell in the basement, this pipe is the main sewer vent up to the roof. There's some "interesting" pipe routing in the basement. This is the main HVAC return duct from upstairs to the basement. We will have to figure out how to re-route it. I'm thinking that it can probably go into...