Week 14 & 15 - More rough-in and insulation!
I apologize for slacking so much on posts. The last few weeks have been crazy busy at work and getting ready for Christmas always takes more time than you think it will.
The two weeks before Christmas were heavy on ductwork and wiring. The concrete pad in the back was demolished and replaced with gravel for the new shed.
Here's a tour through the house, starting with the living room.
A tour around the former dining and expanded kitchen area...
And now moving on to the addition.
Moving on down the hallway...
that was all from the weekend before Christmas. I went over mid-week before we went to Williamsburg the weekend before New Years and they had started putting in the insulation. Here are a few photos of that.
Next post will be from after New Years and you'll be amazed!
The two weeks before Christmas were heavy on ductwork and wiring. The concrete pad in the back was demolished and replaced with gravel for the new shed.
Here's a tour through the house, starting with the living room.
The further away hole is where we have the leak from the upstairs tub. They are suppose to fix that as part of this project. You can also just make out the lines marking the new recessed lights here. |
A tour around the former dining and expanded kitchen area...
The old dining room. The door is temporary until the addition gets closed up. Then that whole opening will be open. |
The north wall of the kitchen. The old door will be a pass-through window. |
The wet wall of the kitchen. Sink will be in almost the same place. |
Continuing around clockwise to the whole east wall. |
The old staircase there in the middle is now full of ductwork. |
Looking to the south. |
Back toward the living room. |
And the new buffet/office area. |
The mess of ductwork in the old stair space. We are finding a use for it after all! |
From the mudroom landing, looking west |
From the mudroom landing, looking toward the original kitchen door (that plywood there at the bottom center) |
Looking straight up at the roof above the staircase |
The run from the landing up to the main level. Right in the middle is the rough-in for the light switches. |
From the new dining room, looking northwest. That whole wall that's plastic right now is going to be windows! |
And the other side, looking northeast. |
Looking south at the original north wall. |
The east wall of the addition. |
Moving down to the basement now.
Laundry room:
Under the stairs |
Our lovely sump (under the mudroom landing) |
The section of our existing wall. You can see how it's just brick and block with nothing else really. |
Our new furnace. |
The mechanical room. The hot water heater will go there to the left of the furnace. |
Closet next to it, where the old closet under the stairs was. |
New shower. |
Spaghetti of wires and pipes above the ceiling in the bathroom. Yellow is the gas line. |
This is the duct up to the living/dining room. |
Duct there in the middle for the bathroom exhaust. Easier to put it there in the wall above the toilet than in the ceiling. |
Main room in the basement |
The other wall |
Next post will be from after New Years and you'll be amazed!
Yay insulation!!