Week 19 - Cabinets & More Brick
I started this post last weekend and then never finished it. I'm a couple of weeks behind, but trying to catch up!
The cabinets were delivered on Thursday week before last. Went over last Saturday morning and the guys were working, doing more masonry since it was dry and a little warmer. Electrician was there to install the box outside but discovered that the brick was still wet and he couldn't drill into it yet. Doh!
The contractors were doing something very noisy in the basement and I had the twins with me, so I didn't go down there. The ladders were also still mostly blocking the staircase (I think they will leave them there until they paint the ceiling) .
Now I have to pick light fixtures, ceiling fans, and cabinet hardware.
Weekend before Saha and I picked paint colors and kitchen backsplash tile.
The cabinets were delivered on Thursday week before last. Went over last Saturday morning and the guys were working, doing more masonry since it was dry and a little warmer. Electrician was there to install the box outside but discovered that the brick was still wet and he couldn't drill into it yet. Doh!
Masons were out there finishing the back wall. They did the piers on the addition the day before. |
The two round pipes are the dryer and bathroom exhaust. The one a the right is the electrical service connection. |
These masons are pretty amazing. I am very pleased with their work. Those of you who know me well know that I have very low tolerance for bad pointing! |
The house is full of boxes of cabinets! |
We have half a kitchen!!!! |
My beautiful cabinet wall! |
Decided a couple days ago to go ahead and have the texture removed from the living room walls and replace the baseboard. Now the texture only exists on the stair and the upstairs hallways walls. |
Ahhhhh.....smooth walls! |
The contractors were doing something very noisy in the basement and I had the twins with me, so I didn't go down there. The ladders were also still mostly blocking the staircase (I think they will leave them there until they paint the ceiling) .
Now I have to pick light fixtures, ceiling fans, and cabinet hardware.
Weekend before Saha and I picked paint colors and kitchen backsplash tile.